Walmart Walmart Factory Audit

Your current location: HOME >> News >> Warl-mart

Walmart Walmart Factory Audit

Release date:2021-05-20 author: click:

1 WALMART related knowledge

1.1 Introduction to WALMART

Wal-Mart Department Store Co., Ltd. was established in Arkansas in 1962 by Mr. Sam Walton, a legend in the American retail industry. After more than 40 years of development, Wal-Mart Department Store Co., Ltd. has become the largest private employer in the United States and the largest chain retailer in the world. At present, Wal-Mart has opened more than 4,900 stores in more than 10 countries and regions around the world, with a total of more than 1.5 million employees, distributed in the United States, Mexico, Puerto Rico, Canada, Argentina, Brazil, China, South Korea, Germany and the United Kingdom. Nearly 140 million customers visit Wal-Mart every week.


1.2 WALMART global procurement

In February 2002, Wal-Mart Department Store Group Corporation established Wal-Mart Global Procurement to facilitate the management of the company’s direct import business and direct purchases from factories. Wal-Mart Global Procurement is mainly responsible for identifying new suppliers, discovering new products, and establishing good cooperative relations with existing suppliers to make Wal-Mart’s direct import supply chain operate better. Global Procurement purchases products in more than 70 different countries around the world, and more than 1,400 employees work in 27 companies in 23 different countries.

2 Issues that need to be paid attention to in the WALMART factory audit

2.1 Issues that should be paid attention to in the personnel aspects of the WALMART factory audit

All matters involving insurance and labor contracts, especially insurance documents. All workers who are not in the scope of the factory inspection must have a holiday (not to appear around the factory, let alone wear factory uniforms and wear badges), and it is better to watch movies in nearby private venues.

2.1.1 The medical examination records of juvenile workers and the filing of juvenile workers.

2.1.2 Time Attendance Card, Monthly Overtime Summary Sheet, Manual Attendance Sheet, Payroll, Monthly Overtime Approval Form, Piece Rate Payroll, Piece Rate Standard, Resignation Approval Procedures, Leave Slips, Split Pay Slips (issued to workers He filled in the questionnaire during the review)


Factory inspection requirements


1. Completion acceptance and fire protection acceptance


The completion acceptance report of the entire factory (dormitory, office, production, warehouse). Buildings before 1998 have not yet implemented fire protection acceptance, but the construction completion acceptance, planning permit, and engineer’s certificate of validity must be provided, one of the three is sufficient;


2. There are different factories in the same building


The fire acceptance report and drill records of the same building, and the fire fighting hardware of the same building in the BSCI factory inspection also meets the fire protection standards;


3. Emergency exit setting


It should not be set on the same side wall, preferably on the opposite side wall or at both ends of the building. If it must be set on the same side wall, the separation distance is ≥50% of the longer diagonal of the plane of the area;


4. Security exit


The evacuation distance from any point in the building to the emergency exit should meet the larger distance calculated along the walking passage below. If these restrictions cannot be met, consideration should be given to setting up more outlets and/or rearranging the outlet configuration. The configuration scheme of the safety exit is as follows:


Production workshop: 76 meters with spray and 61 meters without spray


Office: 91 meters with spray and 61 meters without spray


Distribution Center: 122 meters with spray and 61 meters without spray


5. Fire doors


Install automatic closers, do not install locks and similar devices; open the door, at least 1 meter wide (3 feet) stair platform. The width of the safety exit is more than 1.0 meters. The fire door must be a fire and smoke prevention door, not a rolling door or a sliding sliding door; a push rod lock is installed on the fire door (if you do not install a push rod lock, it is okay to ensure that one action can be opened smoothly), and the door is required to be pushed Use less force, the indoor door does not exceed 5 pounds, which is 22N, which is 2.27KG; the outdoor door does not exceed 50 pounds, which is 222N, which is 22.68KG; if the safety exit door is an electromagnetic door (to ensure that the power is automatically cut off when the alarm occurs), The safety exit door on the first floor can be removed directly if it is not a fire-proof and smoke-proof push-out door;


6. Anti-theft windows


The window used as a safety escape window should be equipped with an opening device, with a width of more than 1 meter, or removed, and there must be a 45-gradient ladder outside the window to escape safely and smoothly.


7. Fire extinguisher


Internal inspections are performed once a month, and a qualified third party or fire department performs inspections once a year, and a label is posted; the distance from any place in the factory to the nearest fire extinguisher must not exceed 28 meters (75 feet / about 25 steps),


8. Emergency lights, fire hydrants, reservoirs


Internal check once a month and keep records, emergency light storage time is 30-60 minutes, water level monitor is installed in the reservoir (above 5cm from the larger water level), the fire water pump control panel modulates the automatic state; the water level of the reservoir ensures the free water level Within 30 cm, install a pool pressure gauge to detect the water level


9. Sprinkler system


For factories producing flammable and explosive products, such as home textiles, clothing, printing, wood products, etc., to install sprays, please refer to [Chinese Fire Protection Regulations]


10. Chemicals


Chemical warehouses shall not be located in production workshops or offices and warehouses or under the stairs or on the roof. They must be independent areas of the factory (ventilation, static discharge equipment, anti-static fire extinguishing equipment, fire protection requirements, explosion-proof emergency lights, explosion-proof safety exit signs, Explosion-proof switch, suspended automatic dry powder fire extinguisher), the workshop only stores the amount of chemicals used on the day, and must not store too much in the workshop; all inflammable and explosive chemicals must be placed in a chemical warehouse that meets the requirements, and the storage volume for temporary use in the workshop Must not exceed 95 liters;